A steam trap survey shows which traps are working, which are blowing steam and which are holding back condensate. We plan the survey, tell your team or local contractor exactly how to test each trap, and turn the results into a repair list ranked by steam loss and risk.

When a steam trap survey makes sense

How the remote trap survey works

01

Trap register

We set up a register from your drawings and photographs: location, trap type, size, pressure and application for every trap in scope.

02

Test method

We specify how each trap should be tested, using temperature readings, ultrasound or sight glasses, and what a good, failed open or failed closed result looks like.

03

Your team tests

Your site team or a local contractor carries out the tests and records the results in the register, with photographs where something looks wrong.

04

Analysis and priorities

We review the results, estimate steam loss for failed traps, flag wrong trap types and poor installations, and rank the repairs.

What you receive

GCC CONTEXT

Why steam trap surveys matter in GCC plants

A trap that fails open sends live steam into the condensate system, and in plants where boiler make-up water comes from desalination, that steam costs fuel, water and treatment chemicals. A trap that fails closed floods the equipment it drains, which leads to water hammer and lost capacity. Regular surveys keep both under control.

What to prepare

Steam trap survey questions

What is a steam trap survey?

A steam trap survey is a systematic check of every trap in a system to find out whether each one is working, failed open, failed closed or wrongly selected for its duty. The results are recorded in a register and used to plan repairs.

How can a trap survey be done remotely?

We plan the survey, set the test method and analyse the results. The physical testing is carried out by your own site team or a local contractor, following our checklist. This keeps the engineering judgement with us and the hands-on work with people already on site.

How are steam traps tested?

The common methods are temperature measurement upstream and downstream of the trap, ultrasound listening to the trap's operating cycle, and sight glasses where fitted. Each method has limits, so we specify which to use for each trap type.

How often should steam traps be surveyed?

It depends on the pressure, the number of traps and how critical the equipment is. Many plants survey at least once a year, and high-pressure or critical traps more often. We suggest an interval based on your results.

What happens after the survey?

You receive a ranked repair list. If the results point to wider problems, such as poor drainage design or low condensate return, we can follow up with troubleshooting or condensate recovery work.

LET’S START WITH YOUR SYSTEM

What is your
steam challenge?

A few useful details make the first technical discussion more productive.

Include your objective, operating conditions and any drawings or photographs available.